Wokrshops and sections
  • A site for receiving and storing materials with an open warehouse, with walk-through racks, a warehouse hangar 10 m high, an overhead crane 30 tons
  • Assembly and welding shop with sections:
  • Processing of the ship's hull, with metalworking, locksmith and welding posts.
  • Preparation of parts and assembly units for painting, with a chamber of a roller-type shot blasting machine QH6925, a zone for manual processing of products.
  • Painting, with the SPK GROUP painting line, including: a phosphating chamber, an open painting area, a sliding drying chamber.
  • Each section of the workshop is equipped with a 10-ton beam crane, transport trolleys, and a supply and exhaust ventilation system.
Stocks, pier, slipway, cranes
  • An open slipway for installation and outfitting of manufactured ships with slipway trucks and a transverse slipway,
  • Open slipway for dock repair of operated ships with slipway trucks,
  • Pier for lifting ships for dock repairs. with crane 600 tons.
  • Frame two-story building. On the ground floor there is an electrical assembly shop, a woodworking shop, a mechanical shop (repair of ship mechanisms), a laboratory, on the second floor there are utility rooms, a dining room.
  • Overhead crane (gantry for warehouse)
  • Crane beam
  • Open warehouse shelving
  • Cross slip.
INDUSTRIAL PREMISES
+7 (729) 234-44-69

Monday to Friday from 9:00 AM till 6:00 PM

Capacity:
  • shipbuilding: 1 ship or vessel within 12 months;
  • ship repair: up to 12 ships per year.
Investment Period
  • 16 month
  • construction of production and infrastructure facilities,
  • technology acquisition
Funding: 
  • 50% from own funds,
  • the rest is external investment, or credit funds of second-tier banks

AKTAU SHIPBUILDING PROJECT

LICENSES, APPROVALS, LAND PLOT, PARTHNERS

LOCATION
Permits
  • All required permits from local authorities and Kazkhstanee Government is in the process : accreditations, certificates, licenses
Land plot
  • For the implementation of the shipbuilding plant project in the suburbs of Aktau, a land plot was defined at the address: Mangistau region, Aktau, Umirzak village, coastal zone.
CONCEPT
Structures
  • Administrative complex, S=1200 m2, H=10 m
  • Warehouse hangar, S=1600 m2, H=15 m
  • Open warehouse, S=3200 m2
  • Production halls S=12000 m2, H=20 m
  • Laboratory complex S=1320 m2, H=5 m
  • Open slipways for assembly and outfitting works S=6424 m2,
  • Open slipways for dock repair S=3600 m2
Ship lifting pier
  • Сslip
  • Overhead crane, lifting capacity 600 tons
  • Gantry crane, lifting capacity 50 tons, span 50 m
  • Gantry crane, lifting capacity 50 tons, span 30 m
  • Open storage shelving
Pneumatic roller bags
  • applies for:
  • lifting the ship for urgent welding or emergency work;
  • removal of the ship from the shore due to the departure of water;
  • scheduled survey of ships;
  • moving the ship to winter sludge;
  • lifting and moving offshore drilling stations;
  • giving buoyancy to construction objects.
Maximum vessel size
  • lifted using the technology of pneumatic roller bags is as follows:
  • vessel carrying capacity 5300 tons,
  • vessel length 140 meters,
  • width 17 meters,
  • draft 3.6 meters.
  • ship dock weight 1600 tons
LIFT AND LAUNCHING VESSELS
STAGES OF CONSTRUCTION OF THE AKTAU SHIPYARD